Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the rocket domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /www/htdocs/w0136ee0/isabellaspapaswebsitta.appwerk.at/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the polylang domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /www/htdocs/w0136ee0/isabellaspapaswebsitta.appwerk.at/wp-includes/functions.php on line 6114
Geotechnical Engineering – freefa

Geotechnical Engineering

Geotechnical solutions for mining, civil and infrastructure works

Our Services

Slope stailisation, foundation design, retention walls, groundwater management

Mining

Pit wall stabilisation, rockfall mitigation, ground support

Civil

Foundation design, slope stabilisation, supervision

Infrastructure

Rockfall protection, debris flow mitigation, slope stability

Projects

Worldwide experience
  • All
  • Albania 🇦🇱
  • Austria 🇦🇹
  • Greece 🇬🇷
  • Hong Kong 🇭🇰
  • India 🇮🇳
  • Indonesia 🇮🇩
  • Malaysia 🇲🇾
  • New Zealand 🇳🇿
  • North Macedonia 🇲🇰
  • Russia 🇷🇺
  • South Korea 🇰🇷
  • Turkey 🇹🇷